当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:top bolster. Next, it determines the location of the backplate, punch plate and punch relative to the top bolster. It recalls the global block WBPLTMOD and inserts the backplate at the location determined above. The program further recalls the global blocks WPPLTMOD and WPNCHMOD and inserts the punch plate and the punc是什么意思?

待解决 悬赏分:1 - 离问题结束还有
top bolster. Next, it determines the location of the backplate, punch plate and punch relative to the top bolster. It recalls the global block WBPLTMOD and inserts the backplate at the location determined above. The program further recalls the global blocks WPPLTMOD and WPNCHMOD and inserts the punch plate and the punc
问题补充:

  • 匿名
2013-05-23 12:21:38
顶部横梁。接下来,它决定了背板的位置,冲板和打孔相对顶端枕。它回顾了全球性的的块wbpltmod和插入背板上面确定的位置。该方案进一步回顾全球wppltmod和wpnchmod块和插入冲板和拳打在确定地点在顶枕
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
顶枕。下一步,它确定后挡板、 冲孔板和相对于顶枕冲头的位置。它回顾全球块 WBPLTMOD,并在上面确定的位置插入后挡板。该程序进一步回顾 WPPLTMOD 和 WPNCHMOD 的全球块并在顶枕中的确定位置插入冲孔板与冲头
  • 匿名
2013-05-23 12:28:18
最高垫子。下一个,它确定 backplate,打孔机器皿和打孔机的位置与最高垫子有关系。回想起全球街区 WBPLTMOD 和在上面被确定的定位插入 backplate。程序进一步回想起全球街区 WPPLTMOD 和 WPNCHMOD 和在最高垫子中的有决心的定位插入打孔机盘子和打孔机
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭