|
关注:1
2013-05-23 12:21
求翻译:安装后段轨道的两个电缆线槽,根据现场要求利用工具给线槽开孔、攻丝、定位。是什么意思?![]() ![]() 安装后段轨道的两个电缆线槽,根据现场要求利用工具给线槽开孔、攻丝、定位。
问题补充: |
|
2013-05-23 12:21:38
Two cable tray installation of rear section of track, according to site requirements to use the tool to the trough opening, tapping, location.
|
|
2013-05-23 12:23:18
After the installation of the orbit of two cable slot, based on an on-site for online slot using the tool to the hole, tapping, and positioning.
|
|
2013-05-23 12:24:58
After the installment the section track two electric cable trunking, opens the hole according to the scene request using the tool to the trunking, attacks the silk, the localization.
|
|
2013-05-23 12:26:38
After installation two cable slot track, according to the site requires the use of tools to trunking hole, tapping, position.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区