|
关注:1
2013-05-23 12:21
求翻译:并对压铸型总厚度、动模座板行程和压室充满度进行了校核是什么意思? 待解决
悬赏分:1
- 离问题结束还有
并对压铸型总厚度、动模座板行程和压室充满度进行了校核
问题补充: |
|
2013-05-23 12:21:38
And die-casting of the total thickness of the stroke of the moving mold base plate and the pressure chamber fullness was calibrated
|
|
2013-05-23 12:23:18
The die-cast models and general thickness, moving the board room is filled with travel, and pressure with the verification
|
|
2013-05-23 12:24:58
And to the compression casting total thickness, moved the mold base plate traveling schedule and presses the room fullness to carry on the examination
|
|
2013-05-23 12:26:38
And a total thickness of die casting die, die Board tour and the Chamber is filled with a check
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区