|
关注:1
2013-05-23 12:21
求翻译:我公司建议,爆破公司应增加设备、人力,且应24小时作业。否则旱期不能保证基础砼浇筑时间,则大坝施工将受到影响是什么意思? 待解决
悬赏分:1
- 离问题结束还有
我公司建议,爆破公司应增加设备、人力,且应24小时作业。否则旱期不能保证基础砼浇筑时间,则大坝施工将受到影响
问题补充: |
|
2013-05-23 12:21:38
My company suggested that the blasting company should increase the equipment, manpower, and should be 24-hour operation. Otherwise dry period can not guarantee that the basis of concrete pouring time, the dam construction will be affected
|
|
2013-05-23 12:23:18
I recommend that companies should be increased, blasting company equipment, manpower, and should be 24 hours job. Otherwise their own view does not guarantee that pouring time based on behalf of the dam construction will be affected
|
|
2013-05-23 12:24:58
Our company suggested that, the demolition company should increase the equipment, the manpower, also should 24 hours works.Otherwise the dry time cannot guarantee the foundation tong construction time, then the dam construction will come under the influence
|
|
2013-05-23 12:26:38
Our recommendation, blast companies should increase the equipment, manpower, and the 24-hour job. Otherwise dry period is no guarantee that the underlying concrete pouring time, construction of the dam will be affected
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区