当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:由于管路漏水、模温机缺水造成生产线停机113次,停机时间总计729min是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由于管路漏水、模温机缺水造成生产线停机113次,停机时间总计729min
问题补充:

  • 匿名
2013-05-23 12:21:38
Due to pipeline leaks, mold temperature water shortages caused by production line shut down 113 times, the total downtime 729min
  • 匿名
2013-05-23 12:23:18
The line leakage, the lack of water production line downtime at 113 total downtime, and 729 min
  • 匿名
2013-05-23 12:24:58
Because the pipeline water leakage, the mold warm machine lack the water to create the production line engine off 113 times, the down time amounts to 729min
  • 匿名
2013-05-23 12:26:38
Resulting from water pipe leaks, mold temperature machine production line shut down 113, total downtime 729min
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭