当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在施工中要多注意观察围岩情况,及时对量测数据进行分析,并在隧道施工中切实做好各种预防塌方的措施,防止塌方发生。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在施工中要多注意观察围岩情况,及时对量测数据进行分析,并在隧道施工中切实做好各种预防塌方的措施,防止塌方发生。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction to observe the surrounding rock situation in a timely manner to analyze the measurement data, and really good job in all kinds of landslides prevention measures to prevent landslides occurred in the tunnel construction.
  • 匿名
2013-05-23 12:23:18
During the construction to take note of the Rock, as measured in a timely manner, and analyze the data in the tunnel construction to do a good job of preventing landslides of measures to prevent landslides.
  • 匿名
2013-05-23 12:24:58
Must pay attention to the observation adjacent formation situation in the construction, promptly carries on the analysis to the gauging data, and completes each kind of prevention landslide practically in the tunnel construction the measure, prevented the landslide occurs.
  • 匿名
2013-05-23 12:26:38
To observe the condition of surrounding rock in the construction, to analyze the survey data in a timely manner, and doing all kinds of landslide prevention measures in tunnel construction, prevent the occurrence of landslides.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭