|
关注:1
2013-05-23 12:21
求翻译:受当时施工技术条件的限制,大坝采用人工填筑,大坝填筑质量达不到规范标准;是什么意思? 待解决
悬赏分:1
- 离问题结束还有
受当时施工技术条件的限制,大坝采用人工填筑,大坝填筑质量达不到规范标准;
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
At that time the conditions of construction technology, and application of artificial dam, Hoover Dam reclaimed landfill specification does not meet quality standards.
|
|
2013-05-23 12:24:58
At that time constructs the engineering factor limit, the dam uses the artificial reclamation, the dam reclamation quality cannot achieve the standard standard;
|
|
2013-05-23 12:26:38
Limited by the construction specifications and manual filling of the dam, dam filling quality does not meet the standards;
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区