|
关注:1
2013-05-23 12:21
求翻译:以木寨岭隧道为工程背景,在理论分析的塑性流动圈大小的基础上,提出了分阶段展开变形控制的措施,进行了早高强混凝土和深孔锚杆的现场试验,是什么意思? 待解决
悬赏分:1
- 离问题结束还有
以木寨岭隧道为工程背景,在理论分析的塑性流动圈大小的基础上,提出了分阶段展开变形控制的措施,进行了早高强混凝土和深孔锚杆的现场试验,
问题补充: |
|
2013-05-23 12:21:38
To the tunnel Muzhailing engineering background, deformation control measures implemented in phases, in the ring size of plastic flow on the basis of theoretical analysis, field trials of the early high-strength concrete and deep anchor.
|
|
2013-05-23 12:23:18
In the wood walled tunnel as an engineering background, theoretical analysis of the plastic flow of the ring size on the basis of sub-stage Distortion control measures with a view to the earlier high tensile concrete and deep hole anchor of the on-site testing.
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
Take the wooden stronghold range tunnel as the project background, in the theoretical analysis plastic flow moving coil size foundation, proposed a minute stage launches the distortion control the measure, has carried on early the excel in concrete and the deep hole anchor rod field test,
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区