当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The turbine meter check is running all the time the zone is running. If the zone runs there must be a positive turbine meter check, this means, the gas flow is at least 6% at a valve opening larger than 25%. This minimum valve opening must be measured and adjusted during commissioning.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The turbine meter check is running all the time the zone is running. If the zone runs there must be a positive turbine meter check, this means, the gas flow is at least 6% at a valve opening larger than 25%. This minimum valve opening must be measured and adjusted during commissioning.
问题补充:

  • 匿名
2013-05-23 12:21:38
涡轮流量计检查正在运行的所有区运行的时间。如果该区域运行,必须是一个积极的涡轮流量计检查,这意味着,气体的流动是在阀门开至少6%比25%更大。这个最小的阀门的开度必须进行测量和调试过程中调整。
  • 匿名
2013-05-23 12:23:18
在风机排料器检查正在运行的区域是否正在运行。 如果区域的运行必须有一个积极涡轮表检查,这就意味着,至少是气体流量阀开度较大的6%比25%。 这一最低限度必须测量阀的开启,调试期间调整。
  • 匿名
2013-05-23 12:24:58
涡轮米检查跑区域一直跑。 如果区域跑必须有一张正面涡轮米支票,这手段,气体流程是至少6%在打开大于25%的阀门。 必须测量和调整在委任期间,这个极小的阀门开头。
  • 匿名
2013-05-23 12:26:38
涡轮咪表检查正在运行所有在区域运行的时间。如果该区域运行必须有积极的涡轮仪检查中,这意味着,气体流量是至少 6%在阀门开度大于 25%。这个最小的阀门开必须衡量,并在调试过程中调整。
  • 匿名
2013-05-23 12:28:18
涡轮米检查一直在开区域在跑。如果地区的跑一定会有一次肯定的涡轮米检查,这意味着,气体流动是开始的一个阀门的至少 6% 更大比 25%。开始的这个最小阀门必须在委托期间被测量和调整。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭