|
关注:1
2013-05-23 12:21
求翻译:热缩管使用喷枪在一个合适的火焰下收缩于母线上.管材收缩完成后需保证管材和母线之间没有气隙的存在。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
热缩管使用喷枪在一个合适的火焰下收缩于母线上.管材收缩完成后需保证管材和母线之间没有气隙的存在。
问题补充: |
|
2013-05-23 12:21:38
Heat shrinkable tube to use the gun to shrink in the flame of a pipe contraction is complete, the need to ensure that no air gap exists between the tube and bus in the bus.
|
|
2013-05-23 12:23:18
Heat-shrink tubing with a blow gun in a suitable fire on the bus to shrink tube shrink when you are done, to ensure that there is no Tube and Bus air gap.
|
|
2013-05-23 12:24:58
The pyrocondensation tube use spray gun contracts under appropriate flame in the generatrix. After the tubing contraction completes must guarantee between the tubing and the generatrix does not have the air gap existence.
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区