|
关注:1
2013-05-23 12:21
求翻译:全桥宽采用5块预应力混凝土T型梁,3块中板,2块边板,跨中梁高为1.7m,支点梁高为1.7m,梁间距2.4m。是什么意思?![]() ![]() 全桥宽采用5块预应力混凝土T型梁,3块中板,2块边板,跨中梁高为1.7m,支点梁高为1.7m,梁间距2.4m。
问题补充: |
|
2013-05-23 12:21:38
Full-bridge width five prestressed concrete t-beam, three panels, two side panels, cross the beam height is 1.7m, the fulcrum of the beam height is 1.7m, beam spacing 2.4m.
|
|
2013-05-23 12:23:18
The bridge with 5 blocks T prestressed concrete girder, 3 block, 2 blocks from the board, the cross-beam to high point, 1.7 M to 1.7 m high beams, spacing 2.4 m.
|
|
2013-05-23 12:24:58
The entire bridge width uses 5 prestressed concrete T Liang, 3 boards, 2 sidewalls, cross Liang Gaowei 1.7m, pivot Liang Gaowei 1.7m, Liang spacing 2.4m.
|
|
2013-05-23 12:26:38
Prestressed concrete t-beam bridge wide by 5 blocks, 3 blocks, 2 side panels, cross beams for 1.7m, Fulcrum beam 1.7m, 2.4m beam spacing.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区