当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:schemes and operation parameters for the corner notch highlighted in Fig. 5a. Finally, the necessary tools are selected and the machining time established. Figure 5d shows the information displayed at this stage for the third of the three numerically controlled (NC) sequences needed to produce the corner notch of Fig. 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
schemes and operation parameters for the corner notch highlighted in Fig. 5a. Finally, the necessary tools are selected and the machining time established. Figure 5d shows the information displayed at this stage for the third of the three numerically controlled (NC) sequences needed to produce the corner notch of Fig.
问题补充:

  • 匿名
2013-05-23 12:21:38
图强调的角落缺口的计划和运行参数。 5A。最后,必要的工具选择和建立加工时间。图5d显示的信息显示在这个阶段的三个数控(NC)生产所需的无花果角落缺口序列第三。 5A。
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭