|
关注:1
2013-05-23 12:21
求翻译:施工期间此路将被封闭,禁止一切车辆和行人通行,请绕行沙路和海滨路。是什么意思?![]() ![]() 施工期间此路将被封闭,禁止一切车辆和行人通行,请绕行沙路和海滨路。
问题补充: |
|
2013-05-23 12:21:38
During the construction of this road will be closed to all vehicular and pedestrian traffic, to bypass the Sand Road and Waterfront Road.
|
|
2013-05-23 12:23:18
This way during construction will be closed to all vehicles and pedestrians, please bypass road and beach road.
|
|
2013-05-23 12:24:58
Construction period this group is sealed up, forbids all vehicles and the pedestrian passes through, please detour the sand road and the seashore road.
|
|
2013-05-23 12:26:38
During the construction of this road will be closed to all vehicular and pedestrian traffic is banned, please sand bypass road and Beach Road.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区