当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The management responsible for the area being audited shall ensure that actions are taken without undue delay to eliminate detected nonconformities and their causes. Follow-up activities shall include the verification of the actions taken and the reporting of verification results.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The management responsible for the area being audited shall ensure that actions are taken without undue delay to eliminate detected nonconformities and their causes. Follow-up activities shall include the verification of the actions taken and the reporting of verification results.
问题补充:

  • 匿名
2013-05-23 12:21:38
被审计的地区负责的管理应确保无故拖延,以消除发现的不合格及其原因采取行动。后续活动所采取的行动应包括核查和验证结果的报告。
  • 匿名
2013-05-23 12:23:18
负责管理的区域被审计单位应采取行动确保毫不拖延地在消除检测到非一致性及其原因。 后续活动的核查应包括所采取的行动和所报告的核查结果。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
负责被
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭