求翻译:为尽快获得工程师对费用的批准,目前费用测算仍按照以前提交预估工程量进行考虑。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
为尽快获得工程师对费用的批准,目前费用测算仍按照以前提交预估工程量进行考虑。
问题补充: |
|
2013-05-23 12:21:38
As soon as possible to obtain the approval of the engineer of the cost, the cost estimates are still in accordance with the previously submitted estimates of quantities to be considered.
|
|
2013-05-23 12:23:18
As soon as possible to get the approval of the cost engineer, currently costing is still in accordance with the previous pre-Islamic works submitted for consideration.
|
|
2013-05-23 12:24:58
For obtains engineer as soon as possible to the expense authorization, at present the expense reckoning still deferred to before submitted the estimate resilience to carry on the consideration.
|
|
2013-05-23 12:26:38
Approved by the engineer cost as soon as possible, currently cost calculation is in accordance with previously submitted to the estimated quantities for consideration.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|