当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Contractor shall also provide a masterplan, preferably to scale 1:50,000 to correlate all survey sheets, indicate main communications, property boundaries, trigonometrical stations relative to the line route, and tabulate all data required for pegging of tower positions, including angle points with the appropriate 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall also provide a masterplan, preferably to scale 1:50,000 to correlate all survey sheets, indicate main communications, property boundaries, trigonometrical stations relative to the line route, and tabulate all data required for pegging of tower positions, including angle points with the appropriate
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商还应提供一个总体规划,最好是1:50000扩展到相关的所有调查表,表明主要通信,财产边界,三角站相行路线,并制成表格挂塔职位所需的所有数据,包括与角点适当的测量和偏差的方向和角度。
  • 匿名
2013-05-23 12:23:18
承包者还应提供一个总纲,最好是以比例1:5万元,所有相关调查表,表明主通信、物业界限,trigonometrical站相对的直线航线,并制成表格挂的塔所需的所有数据,包括角度测量点时具有适当和方向以及角度的偏差。
  • 匿名
2013-05-23 12:24:58
承包商也将提供一masterplan,更好地称1:50,000关联所有勘测板料,表明主要通信,物产界限, trigonometrical驻地相对线路线和制成表为塔位置钉需要的所有资料,包括角度点与适当的测量和方向和偏向角。
  • 匿名
2013-05-23 12:26:38
承建商还应提供总纲计划,力争在规模 1:50,000 到关联调查的所有工作表,表明主要通讯、 财产边界、 三角站相对于线,并制成表格挂的塔职位,包括适当的测量和方向和角度偏差的角点时所需的所有数据。
  • 匿名
2013-05-23 12:28:18
承包商也将提供一项总体规划,最好测量 1 点 50 分, 000 使所有调查相互关联单子,表示主要通信,财产的边界, trigonometrical 站与线路线,所有数据为塔的销子连接需要的 tabulate 有关系放置,包括随着适当的测量和方向获取点和偏离的钓鱼。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭