求翻译:The Contractor shall locate and peg the centre point of all towers to the satisfaction of the Project Manager and shall provide and install a suitable temporary marker carrying the tower number. Each tower location shall be defined by its longitudinal coordinate as established by measuring the distance to an adjacent 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall locate and peg the centre point of all towers to the satisfaction of the Project Manager and shall provide and install a suitable temporary marker carrying the tower number. Each tower location shall be defined by its longitudinal coordinate as established by measuring the distance to an adjacent
问题补充:

  • 匿名
2013-05-23 12:21:38
承包人应当找到并挂在所有塔的中心点项目经理的满意度,并应提供和安装一个合适的临时标记账面塔数量。每个塔的位置,应当确定其纵坐标与已知坐标测量距离相邻的调查PEG确立。承包商应保持所有塔位置的记录“已安装”。
  • 匿名
2013-05-23 12:23:18
承包者应找到并联系汇率的中心塔式所有的项目经理的满意度,并应提供和安装一个合适的临时标记进行气塔号。 每个气塔位置应规定其所确定的测量的纵向坐标系的距离相邻调查销子与已知坐标。 承包商应保持记录所有塔位置安装"。
  • 匿名
2013-05-23 12:24:58
承包商将设置并且固定中点所有塔到项目负责人的满意,并且提供并且安装运载塔数字的一个适当的临时标志。 每个塔地点将由它的纵向座标定义如通过测量距离建立到一个毗邻勘测钉以已知的座标。 承包商将保留所有塔地点纪录“如安装”。
  • 匿名
2013-05-23 12:26:38
承建商应找到挂满意项目经理的所有塔的中心点和须和提供安装合适的临时标记,携带塔数。所确立的用已知的坐标测量到相邻的调查 peg 的距离,须由其纵向坐标定义塔的每个位置。承包商须备存记录所有塔位置的"安装"。
  • 匿名
2013-05-23 12:28:18
承包商将查找和固定到项目经理的满意的所有塔的中心点和将提供和安装具有塔数字的一个合适临时标志。每个塔位置将其经度的同等者所定义的如建立通过测量距离到通过知名的同等者的一枚相邻的调查木钉。承包商将所有塔位置的作记录“如安装”。
 
 