当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:All earthworks up to formation shall be formed and completed to the correct lines, slopes, widths and levels shown on the approved drawings and with the subgrade parallel to and at the correct depth below the profile, camber, crossfall or super-elevation shown for the finished level, unless otherwise directed by the Pr是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All earthworks up to formation shall be formed and completed to the correct lines, slopes, widths and levels shown on the approved drawings and with the subgrade parallel to and at the correct depth below the profile, camber, crossfall or super-elevation shown for the finished level, unless otherwise directed by the Pr
问题补充:

  • 匿名
2013-05-23 12:21:38
应成立并完成了对经批准的图纸和路基平行,并在正确的深度以下的个人主页上,弯度,横斜或超海拔所示的正确的路线,斜坡,宽度和水平为显示所有的土方工程形成完成的水平,除非项目经理。
  • 匿名
2013-05-23 12:23:18
所有防御工事,形成和完成,应形成的正确的路线、斜坡、宽度和水平显示在已批准的图纸和subgrade并行,并在正确的配置文件深度下,车轮外倾角,crossfall或超高度的显示为已完成一级,除非另有指示有关的项目经理。
  • 匿名
2013-05-23 12:24:58
所有土堤由形成决定将被形成并且完成对正确线、倾斜、宽度和水平显示在批准的图画和以路基平行与和在正确深度在为完成的水平或者超高之下显示的外形、反挠度、横坡,除非由项目负责人否则指挥。
  • 匿名
2013-05-23 12:26:38
所有的土木工事达形成,须组成,并完成正确的路线、 斜坡、 宽度和水平显示在图纸上和与路基除非另有指示项目经理平行,并在下面的配置文件、 曲面、 横坡或超高加为成品的水平,显示正确的深度。
  • 匿名
2013-05-23 12:28:18
都土方工程向上到构成将被形成和完成到在有子等级平行的被批准的素描上被显示
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭