|
关注:1
2013-05-23 12:21
求翻译:二次滤网自动投入后,系统按照设计程序,自动进行排污。并且按照设定时间自动循环运行(具体时间设定根据实际运行要求而定)。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
二次滤网自动投入后,系统按照设计程序,自动进行排污。并且按照设定时间自动循环运行(具体时间设定根据实际运行要求而定)。
问题补充: |
|
2013-05-23 12:21:38
Automatically into the second filter, the system according to the design process, automatic discharge. And automatic cycle operation by setting time (time set according to actual operating requirements).
|
|
2013-05-23 12:23:18
Automatic input filter 2 times in accordance with the design process, the system automatically sewage. And in accordance with set time cycle automatically run (specific time setting in accordance with actual running require.
|
|
2013-05-23 12:24:58
After two mesh automatic investments, the system according to the design procedure, carries on the pollution discharge automatically.And (concrete time hypothesis basis actual movement request decides) according to the hypothesis time autocycle movement.
|
|
2013-05-23 12:26:38
After the second filter automatically inputs, the system by design program, auto emissions. And set time automatically loops run (set at a specific time based on actual operational requirements may be).
|
|
2013-05-23 12:28:18
After the second filter automatically inputs, the system by design program, auto emissions. And set time automatically loops run (set at a specific time based on actual operational requirements may be).
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区