当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:根据地形图和纵断面图,进行排水设计和涵洞的大体布设是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据地形图和纵断面图,进行排水设计和涵洞的大体布设
问题补充:

  • 匿名
2013-05-23 12:21:38
According to the topographic map and longitudinal section, drainage design and the general layout of the culvert
  • 匿名
2013-05-23 12:23:18
In accordance with topographic maps and 纵断面 figure, and a drainage design, and box culverts in general terms, hoc
  • 匿名
2013-05-23 12:24:58
According to the topographic diagram and the profile diagram, carry on the draining water design and the culvert roughly build
  • 匿名
2013-05-23 12:26:38
Based on the topographic map and Profile, a drainage culvert design and general arrangement
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭