求翻译:(4)加强宏观控制,严格控制各分阶段施工任务中的重点工程以各阶段的施工任务做为控制目标,从设备和队伍的配备上,都要严格挑选,施工工班的配备尽量趋向专业化,使工程施工工序紧凑、高效,从而加快施工进度。同时在人员、资金、物资、机械上优先保证重点工程施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(4)加强宏观控制,严格控制各分阶段施工任务中的重点工程以各阶段的施工任务做为控制目标,从设备和队伍的配备上,都要严格挑选,施工工班的配备尽量趋向专业化,使工程施工工序紧凑、高效,从而加快施工进度。同时在人员、资金、物资、机械上优先保证重点工程施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
(4) to strengthen macro-control, strict control of the phased construction of key projects to the task of the various stages of construction tasks as the control target, with a team from the device and on, must be carefully selected, with construction workers as much as possible towards the professi
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
(4) enhancement macrocontrol, strictly controls in each minute stage construction duty the priority project to do take various stages construction duty as the control goal, from the equipment and on troop's equipment, all must choose strictly, the construction labor class's equipment tends to the sp
  • 匿名
2013-05-23 12:26:38
(4) strengthening macro-control, strictly control every stage of the construction of key projects in various stages of construction tasks to do for the control of the target, and teams from the device equipped, to a rigorous selection process, construction of class is equipped with specialized, comp
  • 匿名
2013-05-23 12:28:18
(4) strengthening macro-control, strictly control every stage of the construction of key projects in various stages of construction tasks to do for the control of the target, and teams from the device equipped, to a rigorous selection process, construction of class is equipped with specialized, comp
 
 