|
关注:1
2013-05-23 12:21
求翻译:在安装密封圈之前先涂上冷冻油,但涂得量要少,然后将密封圈装在密封接头的坡口上是什么意思?![]() ![]() 在安装密封圈之前先涂上冷冻油,但涂得量要少,然后将密封圈装在密封接头的坡口上
问题补充: |
|
2013-05-23 12:21:38
Coated with refrigerant oil before installing the ring, but smeared in the amount of less then ring installed in the seal groove joints
|
|
2013-05-23 12:23:18
At first before installing the seal coat with oil paint, but it is less, and then place the seal of the sealed connector port on slope
|
|
2013-05-23 12:24:58
In installs in front of the seal packing collar spreads first freezes the oil, but spreads measures must be few, then installs the seal packing collar in the seal joint bevel
|
|
2013-05-23 12:26:38
Coated with frozen oil before installing sealing ring, but James was less, and then load the seals in Seal joints on the Groove
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区