当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:4月12日,中国重汽(香港)有限公司济南动力部一座占地3.2万平方米的曼发动机项目正在做最后的装配线安装调试。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
4月12日,中国重汽(香港)有限公司济南动力部一座占地3.2万平方米的曼发动机项目正在做最后的装配线安装调试。
问题补充:

  • 匿名
2013-05-23 12:21:38
April 12, China National Heavy Duty Truck (Hong Kong) Co., Ltd., Jinan Power Ministry an area of ​​32,000 square meters of Man engine is doing the final assembly line installation and commissioning.
  • 匿名
2013-05-23 12:23:18
On 12 April, the sparkling (Hong Kong) Limited of Jinan, a 32,000 square meters of Cayman engine project is making the final assembly line installation and debugging.
  • 匿名
2013-05-23 12:24:58
On April 12, the Chinese heavy steam (Hong Kong) limited company Jinan power department occupying a land area of 32,000 square meter graceful engine projects are making the final assembly line to install the debugging.
  • 匿名
2013-05-23 12:26:38
On April 12, sinotruk (Hong Kong) limited company in Jinan power one man engine project covers an area of 32,000 square meters is doing the final assembly line of installation and adjustment.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭