当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:施工单位和企业之间沟通不畅,或者施工单位错误地理解设计单位的设计图纸,或者企业不科学地要求施工单位进行设计变更,可能会对现场的平面布置存在失误,如间距、方位、相邻厂房性质等方面。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工单位和企业之间沟通不畅,或者施工单位错误地理解设计单位的设计图纸,或者企业不科学地要求施工单位进行设计变更,可能会对现场的平面布置存在失误,如间距、方位、相邻厂房性质等方面。
问题补充:

  • 匿名
2013-05-23 12:21:38
Miscommunication between the construction unit and corporate construction unit misinterpreted the design drawings of the design units or enterprises unscientific construction units, design changes may would be the scene of the layout there is a mistake, such as spacing, orientation, relative to adja
  • 匿名
2013-05-23 12:23:18
Construction units and poor communication between companies, or construction unit to design units of the design drawings, or a business is not a scientific Construction units to a design change on the ground, it may be there is wrong with the plane, such as spacing, orientation and the adjacent plan
  • 匿名
2013-05-23 12:24:58
Between the construction and the enterprise communicates impeded, either the construction understood wrongly designing department design paper, either the enterprise requests the construction to carry on the design change not scientifically, possibly can to the scene plane arrangement existence faul
  • 匿名
2013-05-23 12:26:38
Due to poor communication between units and enterprises in construction, or construction errors, understanding the design drawings of the design unit, or business science, requiring the construction of design changes, site layout may be mistakes, adjacent to plants such as distance, azimuth, propert
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭