求翻译:按批准的施工组织设计平面布置图,修建生产和生活设施,合理布局。施工现场四周设置排水沟,及时完成“三通一平”,创造良好的施工环境,建设文明工地。施工现场内加工场地、预制场地、材料堆放场地采用混凝土硬化。水电管线按照规范架设,生产、生活区分开布置。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
按批准的施工组织设计平面布置图,修建生产和生活设施,合理布局。施工现场四周设置排水沟,及时完成“三通一平”,创造良好的施工环境,建设文明工地。施工现场内加工场地、预制场地、材料堆放场地采用混凝土硬化。水电管线按照规范架设,生产、生活区分开布置。
问题补充: |
|
2013-05-23 12:21:38
According to the approved construction design floor plan, construction of production and living facilities, rational distribution. Construction site four weeks to set the drains, the timely completion of "leveling" to create a good environment for the construction, building a civilized site. Process
|
|
2013-05-23 12:23:18
The approved construction organization graphic layout design, production and living facilities, construction layout. Construction site drainage ditches, and set up 4 week 3 " completed in a timely manner, and to create good land of civilization construction environment, building site. On-site proces
|
|
2013-05-23 12:24:58
According to the authorized construction organization plan floor-plan, the construction produces and lives the facility, reasonable layout.The job location all around establishes the drain, completes “the Three Contacts promptly one evenly”, creates the good construction environment, the constructio
|
|
2013-05-23 12:26:38
The approved construction design floor plans, construction of the production and living facilities, reasonable layout. Set around the construction site trench, the timely completion of "three connections and one leveling", creating a good environment, building civil site. Construction site in the pr
|
|
2013-05-23 12:28:18
According to the approved construction design floor plan, construction of production and living facilities, rational distribution. Construction site four weeks to set the drains, the timely completion of "leveling" to create a good environment for the construction, building a civilized site. Process
|