|
关注:1
2013-05-23 12:21
求翻译:要求施工单位对楼顶风管预留洞口进行围护是什么意思? 待解决
悬赏分:1
- 离问题结束还有
要求施工单位对楼顶风管预留洞口进行围护
问题补充: |
|
2013-05-23 12:21:38
Requirements of the construction units to set aside hole on the roof duct enclosure
|
|
2013-05-23 12:23:18
Construction of buildings for pulling together the units reserved for Cave of the
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
Wind pipe, require the construction units to floor, reserved entrance exterior
|
|
2013-05-23 12:28:18
The request construction reserves Dongkou to the roof air hose to carry on the surrounding protection
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区