|
关注:1
2013-05-23 12:21
求翻译:为了缓解电力供应对集团发展的制约,公司于2004年初决定自建发电厂,以解决电网供电不足的矛盾,并委托四川省电力设计院进行设计。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
为了缓解电力供应对集团发展的制约,公司于2004年初决定自建发电厂,以解决电网供电不足的矛盾,并委托四川省电力设计院进行设计。
问题补充: |
|
2013-05-23 12:21:38
In order to alleviate the constraints of the power supply on the development of the Group, the company decided in early 2004 to a self-built power plant, designed to solve the problem of insufficient power grid, and commissioned by the Sichuan Electric Power Design Institute.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
In order to alleviate the electric power supply the restriction which develops to the group, the company in at the beginning of 2004 decided from constructs the power plant, resolves the electrical network power supply insufficient contradiction, and entrusts the Sichuan electric power design instit
|
|
2013-05-23 12:26:38
In order to alleviate the electricity supply constraints on the development of the group, in early 2004, the company decided to build power plants in order to solve the contradiction of insufficient power supply, and to entrust the design of Sichuan electric power Design Institute.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区