当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:the operator just needs not to rest their hands on the driver’s “T” handle. The way that this system was designed is that you push down to drive the screw and after the screw is driven you lift the driver and request another screw as you relocate to the new hole location. The screw should be in the nose body before you是什么意思?

待解决 悬赏分:1 - 离问题结束还有
the operator just needs not to rest their hands on the driver’s “T” handle. The way that this system was designed is that you push down to drive the screw and after the screw is driven you lift the driver and request another screw as you relocate to the new hole location. The screw should be in the nose body before you
问题补充:

  • 匿名
2013-05-23 12:21:38
操作员只需要他们的手,对驾驶员的“T”型手柄不休息。该系统设计的方式是你下推驱动螺杆和螺杆驱动后,你解除驱动程序,并要求你搬迁到新的孔的位置,其他螺丝。螺丝应该是在鼻子的身体之前,你到新孔的位置。
  • 匿名
2013-05-23 12:23:18
操作员只需要不将双手放在驱动程序的“t”形手柄。 该系统设计的方式是,在向下推后,驱动器的螺钉和螺杆驱动的驱动程序和要求您提起另一个螺钉,重新定位,您的新位置的孔中。 螺杆应在鼻前孔位置您可以在到达新。
  • 匿名
2013-05-23 12:24:58
操作员需要不休息他们的手在司机的“T”把柄。 这个系统被设计的方法是您推挤下来驾驶螺丝和,在驾驶螺丝您推力司机,并且之后请求另一个螺丝,因为您调迁到新的孔地点。 在您到新的孔地点之前,螺丝应该在鼻子身体。
  • 匿名
2013-05-23 12:26:38
该运算符只需要不停留在他们的手上该驱动程序的"T"句柄。这一系统设计的方法是你推,驱动器上的螺钉和螺丝驱动后你提起该驱动程序,并请求另一个螺钉,如您将重新定位到新孔的位置。螺钉应在鼻子正文之前你到新孔的位置。
  • 匿名
2013-05-23 12:28:18
操作员只是不必在司机的“T”手柄上休息他们的手。这个系统被设计是你推倒的方法赶螺钉和螺钉被赶后你升力司机和请求另一颗螺钉由于你重新安置到新孔位置。螺钉你到达新孔位置之前应该在鼻子身体中。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭