求翻译:乙方必须按照甲方提供的厂房条件、工艺线路图等技术资料进行生产线的总体设计并在合同确定2周内提供水电气等动力供应点及其容量。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
乙方必须按照甲方提供的厂房条件、工艺线路图等技术资料进行生产线的总体设计并在合同确定2周内提供水电气等动力供应点及其容量。
问题补充:

  • 匿名
2013-05-23 12:21:38
Party B technical information must be in accordance with the Party to provide the plant conditions, process and circuit diagram of the overall design of production lines and provide water, electric power supply to the point and its capacity determined in the contract within 2 weeks.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
The second party must defer to technical datas and so on workshop condition, craft circuit diagram which the party of the first part provides carries on the production line the system design and in the contract determined in 2 weeks provides the water and electricity to be mad and so on the power su
  • 匿名
2013-05-23 12:26:38
Str must be provided in accordance with the customer's plant conditions, process lines and other technical information for design of production line and in contract within 2 weeks to provide hydroelectric power supply points such as gas and its capacity.
  • 匿名
2013-05-23 12:28:18