|
关注:1
2013-05-23 12:21
求翻译:for example, dam height and spillway capacity might be appropriately designed based on the estimated flood hydrographs with the 1,000 year return prriod, so that the 1,000 year flood should be safely discharged through the spillway without overtopping the dam crest是什么意思? 待解决
悬赏分:1
- 离问题结束还有
for example, dam height and spillway capacity might be appropriately designed based on the estimated flood hydrographs with the 1,000 year return prriod, so that the 1,000 year flood should be safely discharged through the spillway without overtopping the dam crest
问题补充: |
|
2013-05-23 12:21:38
例如,可能是适当的设计坝高和泄洪能力的基础上估计洪水水位与1000年的回报prriod,使1000年一遇洪水安全通过溢洪道排出不漫坝顶
|
|
2013-05-23 12:23:18
举例来说,水坝高度能力和溢洪道可能适当的设计的估计水灾hydrographs prriod返回的一千年,以便在千年洪水应安全地履行通过溢流没有安全措施的堤坝通路
|
|
2013-05-23 12:24:58
例如,水坝高度和溢洪道容量也许适当地被设计根据估计的洪水水位图与1,000年回归prriod,因此应该通过溢洪道安全地释放1,000年洪水,无需超过水坝冠
|
|
2013-05-23 12:26:38
例如,大坝高度和泄洪能力可能适当设计基于估计的洪水流量过程图与 1,000 年返回 prriod,使 1,000 年洪水应通过溢洪道不漫坝坝顶的情况下安全地排
|
|
2013-05-23 12:28:18
例如,可能是适当的设计坝高和泄洪能力的基础上估计洪水水位与1000年的回报prriod,使1000年一遇洪水安全通过溢洪道排出不漫坝顶
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区