|
关注:1
2013-05-23 12:21
求翻译:说明: 根据工程项目的难易程度和规模的大小,设计内容的不同,价格将随之变化。系统工程设计一般不超过工程总量的6%;非标设计最高报价不超过工程量的14%。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
说明: 根据工程项目的难易程度和规模的大小,设计内容的不同,价格将随之变化。系统工程设计一般不超过工程总量的6%;非标设计最高报价不超过工程量的14%。
问题补充: |
|
2013-05-23 12:21:38
Note: The price will change, depending on the difficulty of the project and the size, design content. Systems engineering is generally not more than 6% of the total project; non-standard design and the highest bid does not exceed 14% of the amount of engineering.
|
|
2013-05-23 12:23:18
Description: Based on the level of difficulty and projects the size of the content, design, price will change. Systems engineering is not generally exceed 6 per cent of the total; non-standard design maximum pricing does not exceed 14 per cent of the amount of work.
|
|
2013-05-23 12:24:58
Explanation: According to engineering project difficulty degree and scale size, design content difference, price along with it change.The systems engineering design does not surpass the project total quantity generally 6%; The non-sign design highest quoted price does not surpass the resilience 14%.
|
|
2013-05-23 12:26:38
Note: according to the degree of difficulty and scale the size of the project, depending on the design, the price will change. Systems engineering is generally not more than 6% of the total work of non-standard design maximum quantities in quotation does not exceed 14%.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区