求翻译:the alternative A is a reservoir scheme(JICA Master plan 1994) consisting of a fixed concrete dam with a 70 m high, intake, headrace tunnel 5007 m of length, penstock 240 m, surge tank, and open air powerhouse with 2 units of Francis turbine, and a tailrace. the water relrase from power house will be flow to Xe Namnoy 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
the alternative A is a reservoir scheme(JICA Master plan 1994) consisting of a fixed concrete dam with a 70 m high, intake, headrace tunnel 5007 m of length, penstock 240 m, surge tank, and open air powerhouse with 2 units of Francis turbine, and a tailrace. the water relrase from power house will be flow to Xe Namnoy
问题补充:

  • 匿名
2013-05-23 12:21:38
替代一个固定与一个70米高,摄入量,引水隧洞5007米,长240米,压力管道,调压井,并与2个单位的弗朗西斯露天重地的混凝土大坝的组成是一个水库的计划(国际协力事业团1994年总体规划)涡轮,尾水渠。从电源内部的水relrase将氙Namnoy河的流量,如下面的图5.2-1所示。这种替代应该搬迁3个briges,和1450米的道路
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
选择A是1994)包括一个固定的具体水坝与70 m高,进水闸、headrace隧道5007 m长度,笔杆240 m,浪涌坦克和露天大力士的水库计划(JICA总计划与Francis涡轮和tailrace 2个单位。 水relrase从力量房子下面将是流程向Xe Namnoy河,如图5.2-1所显示。 应该调迁这个选择三briges和路的1450 m
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
替代一个固定与一个70米高,摄入量,引水隧洞5007米,长240米,压力管道,调压井,并与2个单位的弗朗西斯露天重地的混凝土大坝的组成是一个水库的计划(国际协力事业团1994年总体规划)涡轮,尾水渠。从电源内部的水relrase将氙Namnoy河的流量,如下面的图5.2-1所示。这种替代应该搬迁3个briges,和1450米的道路
 
 