|
关注:1
2013-05-23 12:21
求翻译:the power station will be designed based on the optimal plan which has been established in chapter 7 the site of the intake dam will be to downstream of confluence of Xe Namnoy river and its tributaries (Houay Katak Tok). the olcation of the power station will be on the right bank of Xe Namnoyriver to the upstream of t是什么意思? 待解决
悬赏分:1
- 离问题结束还有
the power station will be designed based on the optimal plan which has been established in chapter 7 the site of the intake dam will be to downstream of confluence of Xe Namnoy river and its tributaries (Houay Katak Tok). the olcation of the power station will be on the right bank of Xe Namnoyriver to the upstream of t
问题补充: |
|
2013-05-23 12:21:38
该电站的设计将基于最优的计划,该计划已在第7章建立进气坝的网站将氙Namnoy河合流下游及其支流(Houay Katak TOK)。将氙Namnoyriver灌溉堰上游右岸电站olcation。 ,有效地利用现有的头部是将选定的引水渠道toute
|
|
2013-05-23 12:23:18
《电力站的设计将会根据最佳计划,已经设立的网站在第7章的收容坝会对下游的汇合的xE namnoy河及其支流(乌埃katak Tok)。 olcation的权力的权利的站将银行的xE namnoyriver向上游的灌溉堰。 在"tout consultation headrace的渠道将如此获选,团长是提供有效利用
|
|
2013-05-23 12:24:58
发电站将被设计根据在第7章建立了进水闸水坝站点将是对顺流合流Xe Namnoy河和它的附庸国的优选的计划(Houay Katak Tok)。 发电站的olcation在Xe Namnoyriver右岸对逆流灌溉测流堰。 headrace渠道toute将是,因此选择有效地运用可利用的头
|
|
2013-05-23 12:26:38
电站将根据设计优化计划中的第 7 章成立了进水口坝的网站将会到下游的 Xe Namnoy 河和 (班会 Katak Tok) 及其支流交汇处。电力站扣将 Xe Namnoyriver 灌溉堰上游右堤。引水渠道的 toute 将会因此选定该可用头有效的运用
|
|
2013-05-23 12:28:18
该电站的设计将基于最优的计划,该计划已在第7章建立进气坝的网站将氙Namnoy河合流下游及其支流(Houay Katak TOK)。将氙Namnoyriver灌溉堰上游右岸电站olcation。 ,有效地利用现有的头部是将选定的引水渠道toute
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区