|
关注:1
2013-05-23 12:21
求翻译:in this project, the intake dam will be constructed on Xe Namnoy river at a location which is approximately 1300 m the downstream from the Xe Namnoy's bridge, and 200m downstream of confluence of Xe Namnoy river and Houay Katak Tok River, which is flow downstream of Houay Ho hydropower project. the power station will b是什么意思? 待解决
悬赏分:1
- 离问题结束还有
in this project, the intake dam will be constructed on Xe Namnoy river at a location which is approximately 1300 m the downstream from the Xe Namnoy's bridge, and 200m downstream of confluence of Xe Namnoy river and Houay Katak Tok River, which is flow downstream of Houay Ho hydropower project. the power station will b
问题补充: |
|
2013-05-23 12:21:38
在这个项目中的摄入量大坝将氙Namnoy河建造约1300米的位置的氙Namnoy的桥梁,并200米氙Namnoy河和Houay Katak汇合处下游下游托河,流向下游的Houay河水电工程。氙Namnoy河右岸电站将修建从灌溉堰上游约1000米的位置,将一个5860米长的引水系统和一个221米长的压力钢管无连接的摄入大坝和电站0.1,235米长的水渠2号和长的压力钢管3号。主要结构的突出特点是,如图所示
|
|
2013-05-23 12:23:18
在本项目下,将建造水坝摄取xE namnoy河上在一个位置,是大约在1300米的下游的xE namnoy的大桥,和200m xE namnoy河下游的汇合之处和乌埃katak tok河下游的流量,这是乌埃河水力发电项目。
|
|
2013-05-23 12:24:58
在这个项目,进水闸水坝在Xe Namnoy河在是大约1300 m顺流从Xe Namnoy的桥梁的地点和200m将被修建顺流Xe Namnoy河和Houay Katak Tok河的合流,是流程顺流Houay Ho水力发电项目。 发电站在Xe Namnoy河右岸将被修建在地点大约1000 m在上游从灌溉测流堰,并且进水闸水坝和发电站将由一5860 m长headrace和221 m长笔杆没有、235 m长笔杆没有和长的笔杆没有连接。 主要结构明显特点是如所示
|
|
2013-05-23 12:26:38
在此项目中,进水口坝将建造在一个位置,这是下游约 1300 米,从 Xe Namnoy 桥,和 Xe Namnoy 河的交汇处下游 200 米和班会 Katak 托河下游的班会何水电工程流 Xe Namnoy 河上。电站将兴建 Xe Namnoy 河上游约 1000 米的位置在灌溉堰,从右岸,摄入大坝和电站将由 5860 万长引水和 221 米长管道 1 号、 2 号 235 米长的压力钢管和长的压力钢管 3 号连接。主要结构特点如下所示
|
|
2013-05-23 12:28:18
在这个项目中的摄入量大坝将氙Namnoy河建造约1300米的位置的氙Namnoy的桥梁,并200米氙Namnoy河和Houay Katak汇合处下游下游托河,流向下游的Houay河水电工程。氙Namnoy河右岸电站将修建从灌溉堰上游约1000米的位置,将一个5860米长的引水系统和一个221米长的压力钢管无连接的摄入大坝和电站0.1,235米长的水渠2号和长的压力钢管3号。主要结构的突出特点是,如图所示
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区