当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:输电塔溶洞塌陷模拟主要是对输电榙桩基础下出现溶洞后,模拟地基土层、桩以及输电塔失稳的规律特征。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
输电塔溶洞塌陷模拟主要是对输电榙桩基础下出现溶洞后,模拟地基土层、桩以及输电塔失稳的规律特征。
问题补充:

  • 匿名
2013-05-23 12:21:38
Transmission towers cave collapse simulation characteristics of the transmission Ta pile foundation cave, analog foundation soil, pile and the instability of transmission towers law.
  • 匿名
2013-05-23 12:23:18
Power transmission tower collapsed caverns analog is primarily based on the transmission 榙 piles after the caverns, the analog ground soil layers, piles, as well as power transmission tower instability patterns of identity.
  • 匿名
2013-05-23 12:24:58
The transmission tower limestone cave collapse simulation mainly is appears the limestone cave after the electric transmission 榙 pile foundation under, simulates the ground soil layer, the pile as well as the transmission tower jitter rule characteristic.
  • 匿名
2013-05-23 12:26:38
Cave collapse simulation of main transmission tower is a transmission after Ta cave under pile foundation, simulation of the foundation soil, pile, as well as instability pattern characteristics of transmission tower.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭