当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:人工挖孔桩,用人力挖土、现场浇筑的钢筋混凝土桩。人工挖孔桩一般直径较粗,最细的也在800毫米以上,能够承载楼层较少且压力较大的结构主体,目前应用比较普遍。桩的上面设置承台,再用承台梁拉结、连系起来,使各个桩的受力均匀分布,用以支承整个建筑物。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
人工挖孔桩,用人力挖土、现场浇筑的钢筋混凝土桩。人工挖孔桩一般直径较粗,最细的也在800毫米以上,能够承载楼层较少且压力较大的结构主体,目前应用比较普遍。桩的上面设置承台,再用承台梁拉结、连系起来,使各个桩的受力均匀分布,用以支承整个建筑物。
问题补充:

  • 匿名
2013-05-23 12:21:38
Manual digging pile excavation and manpower poured reinforced concrete piles. Manual digging is also more than 800 mm of pile general diameter of coarse, fine, capable of carrying the floor less pressure on the larger structure of the main current application is more common. Pile set above the cap,
  • 匿名
2013-05-23 12:23:18
Hand-dug holes, and the piling excavated, on-site pouring concrete piles. Hand-dug hole diameter piles in general, the most fine of 800 mm or more, the ability to carry a few floors and the pressure is greater, the structure is now being applied more generally. pile on top of the desk set, and then
  • 匿名
2013-05-23 12:24:58
The man-power digs the hole pile, excavates earth, the scene construction reinforced concrete pile with the manpower.The man-power digs the hole pile general diameter to be thick, thinnest also above 800 millimeters, can the load bearing floor be few also the pressure big structure main body, at pre
  • 匿名
2013-05-23 12:26:38
Manual hole digging pile, using human excavation, pour in place reinforced concrete piles. General thicker diameter artificial digging pile, the smallest in more than 800 mm, can carry fewer floors and large structure body pressure, current applications more widespread. Set bearing platform of the p
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭