求翻译:根据《建筑工程冬期施工规程》JGJ104-97的规定,室外日平均气温连续5天稳定低于5℃即进入冬期施工;当室外日平均气温连续5天稳定高于5℃ 时解除冬期施工。为确保冬期工程的顺利进展,我方项目部采取的对策如下:是什么意思?![]() ![]() 根据《建筑工程冬期施工规程》JGJ104-97的规定,室外日平均气温连续5天稳定低于5℃即进入冬期施工;当室外日平均气温连续5天稳定高于5℃ 时解除冬期施工。为确保冬期工程的顺利进展,我方项目部采取的对策如下:
问题补充: |
|
2013-05-23 12:21:38
Five days in a row stable in accordance with the provisions of the construction works in winter construction rules jgj104-97, the outdoor daily average temperature below 5 ℃ to enter the winter construction; lifting construction in winter when the average temperature of the outdoor day for 5 consecu
|
|
2013-05-23 12:23:18
According to the construction of the Statute and winter JGJ construction of Phase 97 OF THE 104-day average temperatures, outdoor for 5 days to stabilize the low, i.e. to 5 °C winter phases; when the outdoor temperature on 5 consecutive days C stability greater than 5 degrees when the construction o
|
|
2013-05-23 12:24:58
According to "Architectural engineering Winter Time Construction Regulations" the JGJ104-97 stipulation, the outdoor daily average temperature continual 5 days is lower than stably 5℃ namely enters the beginning of winter time construction; When outdoor daily average temperature continual 5 days is
|
|
2013-05-23 12:26:38
In accordance with the provisions of the construction specification for winter construction JGJ104-97, outdoor and the average temperature is stable for 5 consecutive days of less than 5 ° c that is entering the winter construction; when the outdoor temperatures stable for 5 consecutive days above 5
|
|