|
关注:1
2013-05-23 12:21
求翻译:工程设计成品的监视和测量执行设计校审制度,在本手册的7.3节“设计和开发”的实施已满足要求是什么意思?![]() ![]() 工程设计成品的监视和测量执行设计校审制度,在本手册的7.3节“设计和开发”的实施已满足要求
问题补充: |
|
2013-05-23 12:21:38
The engineering design of the finished product monitoring and measuring the implementation of the design review system implementation to meet the requirements in 7.3 of this manual design and development "
|
|
2013-05-23 12:23:18
Engineering design of the finished product monitoring and measurement system design review in this manual, Section 7.3 of the design and development" has been implemented meet the requirements of the
|
|
2013-05-23 12:24:58
The engineering design end product surveillance and the survey execution supposes worries over examines the system, in this handbook 7.3 “design and development” the implementation has satisfied the request
|
|
2013-05-23 12:26:38
Finished design of monitoring and measuring implement designing system of proofreading, in this manual in section 7.3 "design and development" has been implemented to meet the requirements
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区