当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:七月六号,我们去了在建的杭州火车东站。建成后将会是亚洲最大的火车站。全站采用了钢结构作为基本结构。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
七月六号,我们去了在建的杭州火车东站。建成后将会是亚洲最大的火车站。全站采用了钢结构作为基本结构。
问题补充:

  • 匿名
2013-05-23 12:21:38
July 6th, we went under construction in Hangzhou East Railway Station. After the completion will be Asia's largest railway station. The station uses steel as the basic structure.
  • 匿名
2013-05-23 12:23:18
July 6, we went to the building in the Hangzhou East Railway Station. After the construction will be Asia's largest train station. The site is using a steel construction as the basic structure.
  • 匿名
2013-05-23 12:24:58
In July six, we have gone to the Hangzhou east station which constructs.After will complete can be the Asian biggest train station.The entire station used the steel structure to take the basic structure.
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭