|
关注:1
2013-05-23 12:21
求翻译:铁水运输线路基基床在路基面以下1.2m深度内应采用强化处理。是什么意思?![]() ![]() 铁水运输线路基基床在路基面以下1.2m深度内应采用强化处理。
问题补充: |
|
2013-05-23 12:21:38
Molten iron transportation line Bedding should be used within 1.2m depth below subgrade surface strengthening treatment.
|
|
2013-05-23 12:23:18
Automobile shipping line's bed at 1.2 m below the roadbed should be reinforced with depth.
|
|
2013-05-23 12:24:58
The molten iron traffic line roadbed foundation-bed the 1.2m depth planted agent uses strengthened processing below the subgrade.
|
|
2013-05-23 12:26:38
Hot metal track subgrade bed within the depth of roadbed surface the following 1.2m the use of enhanced process.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区