当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2.装配高速不当,配合表面不清洁,衬垫破损、位移或未按操作规程规范进行安装。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2.装配高速不当,配合表面不清洁,衬垫破损、位移或未按操作规程规范进行安装。
问题补充:

  • 匿名
2013-05-23 12:21:38
Two. The high-speed improper assembly, with the surface dirty, gasket breakage, displacement, or the failure of operating procedures specification for installation.
  • 匿名
2013-05-23 12:23:18
High-speed incorrectly assembled, tie in with 2 surface is not clean, padded breakage, displacement or not the 3.1 specification for the installation.
  • 匿名
2013-05-23 12:24:58
2. assemblies high speed improper, the mating surface is not clean, the liner breakage, the displacement or has not carried on the installment according to the working instruction standard.
  • 匿名
2013-05-23 12:26:38
2. Improper Assembly speed, mating surfaces are not clean, displacement or gasket is damaged, not according to the rules of specification for installation.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭