当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:31. Position the heat zone assembly over the furnace and lower the assembly back within the vessel keeping steady tension on the hoist until the assembly sits squarely on its own.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
31. Position the heat zone assembly over the furnace and lower the assembly back within the vessel keeping steady tension on the hoist until the assembly sits squarely on its own.
问题补充:

  • 匿名
2013-05-23 12:26:38
31.定位炉热区大会上,降低回在保持稳定张力起重机上直到大会正视坐自己的容器内的程序集。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭