当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在基础工程施工阶段,同时可按事先确定的区域顺序进行基础工程的施工是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在基础工程施工阶段,同时可按事先确定的区域顺序进行基础工程的施工
问题补充:

  • 匿名
2013-05-23 12:21:38
In the basic construction phase, but can be pre-determined areas of infrastructure works in order
  • 匿名
2013-05-23 12:23:18
In infrastructure construction stage, and at the same time can be carried out in accordance with pre-defined regional order basis of construction works
  • 匿名
2013-05-23 12:24:58
In the foundation engineering construction stage, simultaneously may according to the region order which determined beforehand carry on the foundation engineering the construction
  • 匿名
2013-05-23 12:26:38
In foundation engineering construction stage, while according to a predetermined zone order for foundation engineering construction
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭