|
关注:1
2013-05-23 12:21
求翻译:对于-2.000至-4.700米深的基坑,根据地质勘探报告,采用明沟加集水坑排水。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
对于-2.000至-4.700米深的基坑,根据地质勘探报告,采用明沟加集水坑排水。
问题补充: |
|
2013-05-23 12:21:38
-2.000 To -4.700 meters deep pit, according to the geological exploration report, plus sump drain, open ditch.
|
|
2013-05-23 12:23:18
For the -2.000 to 4.700 meters deep, and the pit report based on geological exploration, with open drains and drainage sumps.
|
|
2013-05-23 12:24:58
Regarding - 2.000 to - 4.700 meter deep hole excavated for building foundation, according to the geological prospecting report, uses the open ditch to add sump draining water.
|
|
2013-05-23 12:26:38
-2 to-4.7 m deep Foundation pit, according to the geological exploration report, with open drain and sump pumping.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区