|
关注:1
2013-05-23 12:21
求翻译:Level and compact the fabrication area, ramming mechanically and then place 100mm thick crushed stone to avoid that the rebar is dirtied by mud.Rebar fabrication area shall be distanced with other fabrication area or protected by a partition or fence to lower the hurt risks caused by operation of rebar stretching and so forth.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Level and compact the fabrication area, ramming mechanically and then place 100mm thick crushed stone to avoid that the rebar is dirtied by mud.Rebar fabrication area shall be distanced with other fabrication area or protected by a partition or fence to lower the hurt risks caused by operation of rebar stretching and so forth.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区