当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:If the accuracy of the water meter is affected by disturbances in the upstream or downstream pipeline (for example due to the presence of bends, valves or pumps), the water meter shall be provided with a sufficient number of straight pipe lengths, with or without a flow straightener, as specified by the manufacturer, that the indications of the installed water meter meet the requirements of 4.2.1 or 4.2.2 with respect to the maximum permissible errors and according to the accuracy class of the meter.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
If the accuracy of the water meter is affected by disturbances in the upstream or downstream pipeline (for example due to the presence of bends, valves or pumps), the water meter shall be provided with a sufficient number of straight pipe lengths, with or without a flow straightener, as specified by the manufacturer, that the indications of the installed water meter meet the requirements of 4.2.1 or 4.2.2 with respect to the maximum permissible errors and according to the accuracy class of the meter.
问题补充:

  • 匿名
2013-05-23 12:26:38
如果水表的准确性受干扰的上游或下游管道 (例如由于需要的折弯、 阀门或泵存在),水表须提供足够数量的直管长度,或不流电发夹,作为指定由制造商安装的水表的迹象满足 4.2.1 或 4.2.2 对最大允许误差,根据准确性的要求计量器的类。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭