当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:We have Oyo Tolgoi Copper Mine project located in Mongolia. Basically, we require 100Mw + of power at 10.5Kv, 50Hz. The type of units proposed are diesel engine powered units in a 20 ft container type configuration of around 850Kw/unit. The ambient operating conditions are 700m above sea level, max temperature +40c minimum -30c.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
We have Oyo Tolgoi Copper Mine project located in Mongolia. Basically, we require 100Mw + of power at 10.5Kv, 50Hz. The type of units proposed are diesel engine powered units in a 20 ft container type configuration of around 850Kw/unit. The ambient operating conditions are 700m above sea level, max temperature +40c minimum -30c.
问题补充:

  • 匿名
2013-05-23 12:26:38
我们有 Oyo 陶勒盖铜矿项目位于蒙古。基本上,我们需要 100Mw + 电源在 10.5Kv,50 赫兹。柴油机动力单位在 20 英尺集装箱类型配置的周围 850Kw/单位类型的单位提出。环境经营条件的最大温度 + 40 c 最低零下 30 度 c 海拔 700 米。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭