当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:沿有余灰没清刷干净,粘贴面层后将底灰拉起造成空鼓;浇水不够,形成早期脱水;踢脚板背面铺抹粘砂浆时不到边,且砂浆量少,压实后,边角处没有砂浆,形成边缝处。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
沿有余灰没清刷干净,粘贴面层后将底灰拉起造成空鼓;浇水不够,形成早期脱水;踢脚板背面铺抹粘砂浆时不到边,且砂浆量少,压实后,边角处没有砂浆,形成边缝处。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
No more than the brush along ash paste surface clean, after the ashes, will create empty drum; watering enough catwalks, forming an early dehydration; wipe adhesive mortar shop located on the back side, not less, compacted and mortar volume after the corner, there is no mortar, and form a crevice be
  • 匿名
2013-05-23 12:24:58
Along has Yu Hui not to clean off cleanly, after the glue surface layer pulls up the bottom ash creates the spatial drum; Waters insufficiently, forms the early dehydration; At the back of the skirtboard the shop wipes sticks when the mortar not to the side, also the mortar quantity are few, the pos
  • 匿名
2013-05-23 12:26:38
Ash along more than not brushing clean paste layer bottom ash after pulling up cause a hollowing; water enough, early dehydration; skirting the back shop adhesive mortar is not on the edges, and less mortar, compacted, a corner without mortar, formation of edge RIP.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭