|
关注:1
2013-05-23 12:21
求翻译:The scope of work to be performed is as described in these General Notes, and as shown on the accompanying drawings, to be further supplemented by explanatory details as required. The work shall include all labor and materials required to complete the project as indicated in the Contract Documents.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The scope of work to be performed is as described in these General Notes, and as shown on the accompanying drawings, to be further supplemented by explanatory details as required. The work shall include all labor and materials required to complete the project as indicated in the Contract Documents.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区