当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:semi station electricity time control is strict, maintenance projects, working strength is big, it should develop a detailed and thorough overhaul scheme to ensure repair within the time stipulated in the completed successfully.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
semi station electricity time control is strict, maintenance projects, working strength is big, it should develop a detailed and thorough overhaul scheme to ensure repair within the time stipulated in the completed successfully.
问题补充:

  • 匿名
2013-05-23 12:26:38
半站电时间控制严格,维修项目,工作强度大,它应制订详细和全面检修计划,以确保成功完成规定的时间内的修复。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭